Decentralised composting + MRF for Nagar Nigams & Smart City wards.
Turnkey 5–50 TPD MSWM plants for Urban Local Bodies, Cantonment Boards and Smart City missions. SBM 2.0 / AMRUT 2.0 / 15th FC aligned. GeM-procurable equipment package + civil + commissioning + O&M under one PM team.
Typical scope of supply
- Decentralised composting shed with 2–4 K-Drum / K-Thermo lines
- Pre-treatment dual shaft shredder for MSW
- Trommel screen (60–80 mm) + ballistic separator
- Magnetic separator + air density separator
- K-BPM 25 / 50 baling press for recyclables
- RDF baler + storage area for cement-kiln offtake
- Compost screening unit (vibrating / trommel)
- Curing platform with windrow management
- Leachate collection & treatment package
- SLF rejects routing & transfer station
- PLC-based central control panel + SCADA
- Operator training (bilingual) + AMC option
Eligible funding schemes
- SBM-Urban 2.0 — Centre 25–50%, State 20–30%, ULB 20–50% (city-tier dependent)
- AMRUT 2.0 — Project-based, sanitation outcome framework
- 15th FC tied grant — Direct ULB grant, fastest path
- State scheme — Top-up where central is full
- PPP / HAM — For projects above ₹25 Cr
Compliance docs included
- SWM Rules 2016 alignment dossier
- CPCB MSW Processing Guidelines
- State PCB CTE/CTO documentation
- SBM 2.0 / AMRUT 2.0 MIS alignment
Why ULBs pick K-Civic
🏛 GeM-listed manufacturer
Product code 90131500. Direct procurement, no intermediary markup. MSE price preference under GFR Rule 153 (L1+15%).
🔧 In-house manufacturing
Single-vendor accountability. No imported equipment, no opaque supply chain. Service engineer on-site within 24–48 hr.
📋 DPR-ready BOQ
Free DPR review for ULBs. We provide L1-justifiable specs, rate dossiers, and MIS-aligned reporting templates.
50 TPD ULB plant for a tier-2 city
Project: 50 TPD MSWM, district HQ town in Haryana, 4 lakh population
| Total CapEx | ₹14 Cr |
| Equipment | ₹7 Cr (50%) |
| Civil works | ₹4.5 Cr (32%) |
| Electrical / automation | ₹1.4 Cr (10%) |
| PM & commissioning | ₹1.1 Cr (8%) |
| Timeline | 16 – 20 weeks |
Funding mix
| SBM-U 2.0 | ₹10 Cr (Centre ₹5 Cr + State ₹2.5 Cr + ULB ₹2.5 Cr) |
| 15th FC tied grant | ₹3 Cr (MRF equipment via GeM) |
| ULB own funds | ₹1 Cr (contingency, design) |
Full DPR available on request under NDA.
Have a ULB MSWM project in DPR / tender stage?
Send the document to info@kelvinindia.in for free engineering review.
Common ULB tender questions
Which schemes can fund a K-Civic plant?
SBM 2.0 (50% Centre + 25% State + 25% ULB for 5–50 TPD plants), 15th Finance Commission tied grants, AMRUT 2.0 for cities >1 lakh population, Smart Cities Mission ABD/PAN-City projects. We supply scheme-specific BOQ templates and rate-justification dossiers — see our SBM funding decision tree.
What's the indicative CapEx for a 5 / 25 / 50 TPD plant?
Indicative ex-Manesar (2026): 5 TPD ~₹1.2 – 1.8 Cr · 10 TPD ~₹2 – 3 Cr · 25 TPD ~₹5 – 7 Cr · 50 TPD ~₹10 – 14 Cr. Excludes civil, weighbridge, fire safety, fencing, transformer. ULB own-fund share typically 25% under SBM 2.0; the rest is centre + state.
Which products go into a typical K-Civic line?
Pre-treatment: Dual-shaft shredder (≤3,000 kg/hr) + single-shaft shredder for finer screening. Composting: K-Drum (natural, lowest CapEx) or K-Thermo (heated, FCO-grade). Dry-waste: K-Recover MRF with K-BPM 25 / K-BPM 50 baling press.
What's the typical project timeline?
16-24 weeks DPR-to-commissioning for a 5–25 TPD plant. The longest pole is usually civil works + state PCB CTE/CTO. KWTPL provides design documentation; the ULB drives the consent process.
L1+15% rule under GFR 153 — does KWTPL qualify?
Yes. KWTPL is a GeM-Verified OEM + MSME Udyam-registered (Class-I local supplier under Make-in-India). Our quotes qualify for L1+15% purchase preference under GFR Rule 153 and the Public Procurement Policy. See our full credentials pack.
Post-commissioning support?
1-year comprehensive warranty on all equipment + AMC packages from year 2. Engineer on-site within 24-48 hr of any service call. Same-day spare parts ex-Manesar. Operator training (40 hours) included with commissioning.